Manufacturing puts more pressure on an ERP than trading does. Raw materials become work-in-progress, work-in-progress becomes finished goods, and the cost of each unit depends on what was consumed along the way. General accounting software cannot follow that journey, so the choice of ERP matters more.
Start with the bill of materials
The bill of materials (BOM) is the recipe for your product. Check that the ERP supports multi-level BOMs if your product contains sub-assemblies, and that a production order pulls its material requirement straight from the BOM instead of being typed by hand.
Follow the material, not just the money
A production order should issue raw materials from a store, show them as work-in-progress and receive finished goods back into stock. If material movement and accounting are separate steps, they will not agree for long.
- Raw material issue against a production order
- Work-in-progress visible while the order is open
- Finished goods receipt that increases stock automatically
- Wastage and by-products recorded, not ignored
Insist on real production costing
You should be able to see what each production order actually cost — materials consumed plus the other costs you assign — and compare it with what you expected. Without this, pricing is guesswork and loss-making products stay hidden.
Build quality into the flow
Quality checks work best when they are part of the process: inspection when material arrives, checks during production and a final inspection before dispatch, each with an accept, reject or rework decision that is recorded against the supplier or the order.
Look at stores and warehouses
Most factories have more than one store: raw material, production floor, finished goods, sometimes a second site. The ERP should track stock in each, handle transfers between them with a proper document, and warn you when an item falls below its reorder level.
Questions to ask in the demo
- Can you show a production order from BOM to finished goods using a product like ours?
- Where do I see the actual cost of that order?
- How is wastage recorded, and where does it show up?
- Can a purchase order or production order require approval before it proceeds?
- Who can see costing, and who cannot?
- Who migrates our opening stock and balances, and who trains the production team?
